Daily drilling / station
Daily drilling / station
Daily drilling / station
Highest:78.81 Lowest:76.22
Highest:85.34 Lowest:84
About us
The operation of cementing, in which a casing is run into the well and cement is injected into the annular space between the wellbore and the casing, its main purpose is to protect and support the casing in oil and gas wells, sealing oil, gas and water and other formations.
completion refers to the process of connecting the bottom hole with the reservoir in a certain structure after the open hole reaches the designed depth, which is the last important link of drilling work and the beginning of oil production engineering, it is closely related to oil production, water injection and the development of the whole oil and gas field, and its quality directly affects the production capacity and economic life of the oil well.
The contents are: 1 formation dip logging (to understand the underground structure and sedimentary structure) , 2 saturation logging (to identify lithology, oil, gas and water reservoirs) ; 3 wireline formation testing (for oil, gas, water reservoir testing) ;. It mainly measures the petrophysical properties of the oil, gas and water layers, monitors the working conditions of each oil layer, and checks the technical conditions of the development wells, etc. , it is an important basis for development wells to take operation measures and to adjust oilfield development. It includes saturation logging, production logging and engineering logging.
感谢您访问我们的网站,您可能还对以下资源感兴趣:
少妇久久中文无码,午夜福利资源网站,国产女色在线视频大全, 欧洲野花视频一9,王者公孙离污污啪图,黄片一级片在线播放,国产十八禁在线小视频,印度肥妇BBW快交,久久无码人妻16p,亚洲欧美综合网站